February 18, 2014

Welcome Aboard Collin

Collin Cannon has recently joined the turfgrass team here at GFCC by accepting the assistant superintendent position.  Collin will be graduating this May from NDSU with his degree in Urban Turfgrass Management.

Collin most recently completed his turfgrass internship at the Bully Pulpit Golf Course out in Medora last summer.  He came highly recommended from the Superintendent at that facility, and brings with him a great deal of knowledge and experience from his time spent there.  Prior to that, Collin worked for a summer at the Crow River Golf Club in his hometown of Hutchinson, MN.

For the next few months until school is out, Collin will be coming up to Grand Forks on a few weekends and during his spring break to start learning the ropes around the shop, help out on a few equipment projects, and hopefully get to spend a little bit of time learning the golf course if the snow melts before June.  If you happen to see Collin around the course this spring, please introduce yourself and welcome him to the Grand Forks Country Club.




January 14, 2014

Snow Update

I am happy to report that from the perspective of a turfgrass plant, this winter has been about as close to perfect as we could ask for in ND.  We humans however might have complained that the month of December was brutally cold, with 24 of the 31 days in the month recording a temperature at or below 0.  The average temperature for the month was a lovely -0.6, which was about 11 degrees colder than average, or just plain nasty.

The turf however didn't really mind that cold spell, as it was peacefully slumbering underneath the thickest and most consistent blanket of early season snow that I have witnessed so far in my 3 winters here.  The heavy snow that fell in early December did a pretty good job of staying where it fell and solidifying there before the wind could transport it down to South Dakota.

Furthermore, at least to this point (knock on wood) we have avoided any major warm ups, melts, or rain events that would have turned that snowpack into a wet slush or ice.  This scenario is of course what we experienced in early January last year, which produced an enormous amount of ice on the greens and low spots in the fairways.  We all witnessed how unfortunate that scenario was last spring with the amount of dead turf on the course.

I spent a majority of the day yesterday out on the course evaluating the snow and turf conditions, and even removing some snow fence on the greens that have accumulated what I would classify as "enough".  At some point, there is enough snow to insulate and protect the turf, but any additional snow would just make it that much longer it would take for it to melt off or get cleared off in the spring.  Furthermore, the nice warmup we had over the weekend did just enough melting to turn the snow surface into a solid crust, meaning that it can't be blown around by the wind much more.


11 green, along with 12, 4, and 3 on the west edge of the course next to the
open field are always the first to get destroyed by the wind.  The snowfences
have done a tremendous job holding snow this year.

With almost 2' of snow on the back of some greens however, it was time for
some of the snowfence to come down.

Everywhere I dug into the snow on the golf course was soft and sugary all the way too the ground, which of course is still frozen solid.  This type of snow is absolutely perfect as it holds a lot of air space for insulating purposes, and allows the turf to breathe easily as well.

About a foot of soft and loose snow all the way to the turf.  Pictures
like this help me sleep soundly at night all winter long!

Now, the inevitable part of the discussion that must be brought up when discussing snow in our area, the dreaded "F" word.  While we are still a long way from spring, we did receive quite a bit of snow in December (23"), but there was only .82" of water in it.  The rest of the snowfall from here on out will really determine what kind of flood we will have.  The AHPS should release their first long range outlook by early February, so I will be sure to keep everyone up to date once we see some initial numbers.  But until then, enjoy the winter!


December 28, 2013

Living The Shop Life

Its that time of year again in the northern plains to settle in and find something to do indoors for the winter.  December has been a brutally cold month, and with plenty of snow on the ground to go with it, Andy and I have made some significant progress on some shop work.

We were able to get all the reel grinding and setup done by the early part of December.  For the last 3 weeks, we have been tearing deep into some of the older pieces of equipment that are in need of some serious work.

Our two heavy duty Toro Workmans are model years 1997 and 1999 respectively, meaning they have both seen about 15 years of harsh conditions on the golf course.  Both of these units take a beating daily by hauling all of the heavy loads of gravel, sand, and soil that we need to move around.  One of the units also had an unfortunate collision with a bridge this fall, meaning it was in need of some body work as well.

Between the two units, beyond all the normal fluid, filter, and lube service, we replaced a set of collapsed leaf springs, replaced steering linkage bearings, built a new front bumper, repaired four broken fenders, replaced a leaking seal in a power steering pump, and repainted a bunch of chipped and rusted body parts.

Lots of torch heat was used in the removal and disassembly of all the
rusted and seized bolts on this 15 year old power steering pump. 
Next on the list was the 2007 sandpro.  While it is not one of our older units, it still needed some extra attention. It took almost 2 full days in the shop to trace and find a broken wire in the starting circuit that wouldn't allow the unit to start with the key switch.  We spent the last month of the season this year arcing the starter soleniod with a screwdriver to start the unit.  After the wire was found, we replaced a few worn bearings and bushings in the steering column that were making the unit steer very erratically.

Front steering of the Sandpro completely disassembled.

Lastly, our two 13 year old Toro 325D rough mowers have been in the shop for the last week.  With 5,000 hours on them, these units have the equivalent of about 200,000 miles on them if they were cars.  Needless to say, they are in rough shape.  Both of these mowers are old and slow, and worse, with a 6' wide fixed deck, do a terrible job mowing any of the undulations on the golf course.  These two mowers are top on the list of equipment that needs to be replaced.

In the meantime, they have been torn down pretty extensively this week to replace leaking seals, replace bad bearings, both units got new brakes (neither unit has had a functional parking brake for the last year), replace torn seats, replace leaking and cracked hydraulic hoses, replace worn out belts, and lastly, painting some of the badly chipped and rusted body parts.

The 325s are so torn apart they almost look ready for the junkyard...
Both of these units have already been in the shop for about a week, and still need another week to get them completely put back together.  All told about $1,000 worth of parts have already gone into them just so that they can hopefully make it through another season.  However, with every part we dissassembled to remove and replace, we would find 3 or 4 more associated parts that were worn out and on their last leg.  Realistically, every part on these mowers have outlived their lifespan and are on borrowed time.

I can almost guarantee that both of these mowers, regardless of our best repair efforts this winter, will still be spending some significant down time in the shop next summer replacing a seized bearings, broken belt, sheared off shaft, leaking seal, broken hydraulic hose, etc, etc, etc....




December 17, 2013

Winter Wonderland

Without a doubt, we are off to the best winter we have seen in the 3 years I have been here.  2011 didn't bring us a single snowflake until New Years Eve, leaving the turf to suffer the effects of brutally cold temperatures and drying winds.  2012 brought us a good early snowcover, but then was completely ruined in early January by a rainstorm that created ice all over the golf course.  2013 however has brought a healthy dose of early season snow, that has the turf completely covered and protected from the elements.  We just need this snow to stick around and avoid any mid winter melt cycles or rain (knock on wood).  If we can do that, we actually stand a chance coming out in the spring looking pretty good, as long as we don't get too much more snow in the coming months (again, knock on wood.....)

Early winter 2011 was so dry and open that cigarettes thrown out of cars
in the parking lot were catching the grass on fire!

Early January last year brought us a rainstorm that instantly created
ice, all across the golf course.

December this year has brought us the perfect cover of snow
to keep the turf protected and insulated.
Last week we experienced some brutally cold temperatures, dropping as low as -21 one morning.  To illustrate how much of an insulating effect the snow has on the turf surface, I dug a small hole on 16 green and checked the temperature on the turf surface underneath about 8" of snow.  The air temperature that morning was -16.  The surface of the turf under the snow was a balmy +20.  This 36 degree difference literally is the difference in life and death for Poa Annua.



December of 2013 has definitely created a winter wonderland.  We have already accumulated a total of about 17" of snow so far for the month, with still another 2 weeks to go.  The average snowfall for the entire month is only 12", so we are well ahead of that number.  Furthermore, the temperatures have been brutal.  The temperatures for the first 17 days of the months have so far added up to an average of 0 degrees, which is a whopping 14 degrees colder than average.  Global warming at its finest....

For me, one of the best times of the year on the golf course is the dead of
winter.  The complete peace, silence, and solitude on days like this are what
make the place so special.

November 29, 2013

Irrigation Pond Fixes

Now that the ground is frozen and our friends at Florians Excavating have a few spare moments, we finally were able to tackle the leaking pond overflow culvert.  I discovered back in the middle of the summer that the 15" steel pipe that acts as the high level overflow to the pond, had rusted out somewhere below the water level and was leaking approximately 50 GPM, or 72,000 gallons per day, or somewhere in the neighborhood of 11,000,000 gallons over the course of the summer.  That was all water that we had to pay to pump back into the pond to keep it full.  Needless to say, it was a big deal to get this taken care of.  The old steel culvert was dug back about 5' into the pond bank, smashed, buried in 5,000 lbs of concrete, and then covered back up in dirt.  A new culvert was then dug in about 100' to the north.

Nothing is quite as exciting as that moment when a 25 year old piece of junk
(pain in my rear end) gets torn out of the ground to get replaced!

The new culvert is set entirely above the normal water level, meaning it can
never "leak."  Also, we set the new overflow level about 5" higher than
the old culvert, meaning our pond is capable of holding an extra 335,000
gallons now.

Good time of the year to tear things up....

The new overflow empties out into Cole Creek about 100' further north
of the old pipe, and is piped much closer to the actual creek bank, so
hopefully the bank failure will not continue so rapidly there.

When we finished installing the new overflow pipe, we then turned our attention to the other side of the irrigation pond by 14 fairway.  Back in the beginning of November I removed the old steel culvert that had heaved out of the ground there, with the intention of replacing it with a more functional culvert.  We were able to install a new 8" culvert underneath 14 fairway that will allow us to pump water out of the lakes north of the property without having to actually pump the water into our irrigation pond first.  When the lake level begins to drop as the summer progresses, we will have the ability to close that pipe, and fill our irrigation pond via the river pump or a pump on 14 fairway.

Furthermore, while we had the area torn up, we also installed a 4" pipe and some electrical conduit.  Next spring we should be able to buy a small electric pump that can be installed on the north side of 14 fairway, and pump water from the lake to our irrigation pond through the 4" pipe.  If all goes well, we should never have to use a gas pump or blue hoses on 14 fairway ever again....

Removing the old steel culvert that had heaved up in 14 fairway.

Installation of the new 8" pipe

Lots of new utilities installed under 14 fairway.

Like a lot of the projects we do on the golf course, this one will never be seen or directly affect anyone playing golf, but the impacts that it will have on the way we manage the golf course will be huge.  One of the biggest challenges we have had the last few summers has been trying to keep our irrigation pond full.  Not only will these two projects eliminate countless headaches for me and my staff and allow us to focus on more important aspects of the course, but the cost savings (mostly in fuel costs for the gas pumps, as well as more limited electrical power to run the river pump) should add up to a decent amount next summer as well.  And lastly, after we regrade and reseed the area in the middle of 14 fairway next spring, we should finally be able to have some nice turf there next year!

November 7, 2013

Drainage Upgrades

For those of you who played the course any this year a day or two after one of our big spring or fall rainstorms, you can surely understand the need for more drainage on our course.  While it would be nice to add drainage to the entire course, there are really only a few spots we need to concentrate our efforts in order to make a big difference

A bunker pond after a June rainstorm

Way too much water, and difficult to get rid of

Almost the entire right rough on 6 about 150 yard to the green
and in was standing water during June.

Bunkers in particular are a major concern.  Since they are completely shaped out of clay underneath the sand, they are essentially just a giant bathtub after a rain.  Even after a moderate rainfall, we have to pump out usually about 30 of our 45 bunkers, a huge waste of man hours, plus the fact that repeated pumping starts to destroy the integrity of the bunker.  As of this fall, we have installed drainage (perforated pipe covered with gravel, and then covered with a synthetic liner material to keep the rock separate from the sand above) in 14 bunkers.  We took the opportunity this week to actually continue those drains to daylight somewhere so that they are finally functional.

Secondly, holes 6 and 11 were in desperate need of some additional drainage.  There was some drainage installed on hole 6 back in the early 90s I believe, but after having located and dug up a few of those pipes, the old perforated pipe was either mostly or completely filled with soil, rendering them ineffective.  We started in the worst area, front left of 6 green, by adding a 12" sump basin in the lowest point, and then trenching a 3" drain line about 160' across 6 fairway to the sump basin in the right rough, which then empties into the drainage canal that parallels hole 2.

Hole 11 received some help as well in the trench it shares with holes 12.  After shooting a ton of grade points, I determined that the trench doesn't and can't even actually drain its self.  The farm ditch on the other side of 12 cartpath is actually higher than the lowest point in the trench.  We installed a 12" sump in the lowest point of the trench, which happened to be in the rough about ten feet right of 11 fairway.  We then added french drains (perforated pipe covered with pea gravel, and then sand all the way to the surface) in both directions of the trench.  We will still have to pump the trench out after a large rain, but the sump basin should make that process much easier, and the french drains will help dry out the rest of the trench, especially in 11 fairway where it has always been wet and devoid of any real turf cover.


Going to work on hole 6

French drain line going up the trench in 11 fairway

Bunker drain on 11

After 2 straight days running the trencher, my arms feel like jello...

Also, we have been harvesting the huge pile of old, flooded bunker sand that is piled up in the native area behind 6 tee, and using to fill in some of the really bad settled trenches in other areas of the golf course.  That has been one of my huge complaints about this course since I have been here, you can hardly drive a cart through the rough on some holes without bouncing your golf clubs off the cart.  By filling the trenches with sand, the drains can still function underneath, and the grass should easily grow back and fill the areas in this coming spring with the help of a little additional seeding.
Andy filling in old drainage lines in the right rough on 6


November 3, 2013

Geologic Problems

Of all the issues I try to mitigate as a golf course superintendent, geologic problems are always the hardest to remedy, and usually happen when they are least expected.  The Red River is very young, it formed only 9,500 years ago when Lake Agassiz drained, meaning that coupled with the constant flooding, the river valley is very prone to dramatic changes.

Apparently something shifted pretty dramatically down on the river bank recently.  Just last week we used the large compressor used to blow the water out of the irrigation system to blow the water out of our 6" water transfer line as well.  During the process, it looked like Old Faithful was going off there was so much air and water blowing out of the ground down on the river bank.

It appears that at some point in October, with all of the rain we had, the river bank took a severe slip back behind our maintenance facility.  The river pump transfer line pulled apart in two areas, once in an above ground section, and once again in an area where the pipe was buried about 3' deep.

We took the opportunity to dig up all of the broken pipe with the line out of use for the rest of the season.  We will repair the line as far back as it is broken, and leave the rest of the line disconnected and will just run it all above ground next summer.

We dug up about 120' of the line.

The first break separated the pipe about an inch

The fitting on the right, a gasketed coupler called a "knock on" fitting, used
to overlap the pipe on the left by about 6".  So here, the pipe moved about
10".  Kind of scary how much the ground is moving down by the river....

A scarp face is beginning to form where the bank is literally breaking
off and falling into the river.

Amazingly, this huge cottonwood is still standing, however
it is starting to press against our pipe.

This situation has future disaster written all over it.  Hence the reason the
entire line is coming out and getting moved next spring.