July 20, 2016

Tuesday Storm

The Tuesday evening storm brought us 2.4” of rain at the golf course in about 25 minutes and perfect weather for disease to grow. Fortunately, we have been current with our fungicide preventative applications that we haven’t really had any issues yet.

Ash tree split in half by 4 fairway

We had wind gusts up to 50 mph, but we only lost half of a large ash tree and a few small branches on the course. When I took a drive thru the golf course around 9:30 pm after the storm, there was standing water everywhere. Fairways such as 4, 6, 11, and 1 looked more like small lakes than fairways. Luckily, most of the water had soaked in overnight and we only had to run a few pumps for the morning hours.

6 Fairway 


Ditch between 11/12

Bunkers were a disaster. When it rains that hard, a lot of the sand on the top face tends to wash down to the bottom of the bunker. It took 4 of my staff members most of the day on Wednesday to get the bunkers back into playable shape.



Cart paths also washed out pretty badly. We spent many hours grading the paths back into drivable shape today. 




The crew worked hard in the hot and humid temperatures today and they definitely deserve a pat on the back. Hopefully we don’t get this same rain event tonight as the weather is in favor for it.


July 12, 2016

Where does the time go?


It’s hard to believe that it is already the middle of the golf season. The weather, for the most part, has been cooperative over these past few months with only a few “dry spells” and the grounds crew has been working very hard at getting the golf course dialed in for many more days of golf this year.

We were fortunate to have about 5” of rain in the month of May and beginning of June as we came into the season very dry. We started to get very dry again the later part of June and had to start the river pump back up to fill the pond. That river pump has been a huge benefit for us, except when a 500lb waterlogged tree was jammed up against the pipe last week. That made it my first swim in the Red River.

Other than daily course set up and keeping up with the fast growing grass, the grounds crew has been very busy with sod work, string trimming, tree and pine tree trimming and various other course projects. We have also been busy with and will continue to add sand to a number of our bunkers that are low so that they have a consistent amount throughout. After each rainstorm, we have to spend extra time on bunkers moving sand back up the face where it has washed down. The crew has kept the bunkers in immaculate shape this season.


Bunkers have all been edged and are raked everyday of the week.
We have spent a lot of time trimming up pine trees this season. It makes mowing and trimming underneath them much easier, speeds up golf play and overall looks great!

Greens aeration was completed on June 30th and has already greatly improved the health of the turf and playing conditions. This process removes compaction and the thatch layer (living and dead organic matter) that builds up in the layer under the turfgrass plant. It promotes deeper root growth and allows water and oxygen to get down to the roots of the plant. This aeration has helped with ball roll and to prevent localized dry spots from appearing on greens.

Justin spent about 10 hours on the tractor during aeration. Half of the crew worked a 14 hour day and didn't even complain once! 

To sum up this post, I want to thank my grounds crew. Without this great group of college-aged employees, the golf course would not look as great as it does, and I can’t thank them enough for their hard work and dedication. Many people do not understand how much work goes into keeping a golf course look as great as ours does. We took advantage of last Thursday afternoon without a tournament at the course and enjoyed a much deserved employee scramble.

We have many things planned for the rest of the season and we hope everyone can come out to enjoy our beautiful North Dakota golf course!



Here is a great article from the USGA that I found on green speed that I would like to share.






March 18, 2016

Golf season is almost here


The warm temperatures have arrived quick this 2016 season and the snow is just about completely melted. The course should be dry enough to play on very soon. We were very fortunate to have a much milder winter this year than 2015. We began winter with decent temperatures and a few snow falls of about 3” each in late December and that kept the turf insultated until the end of January. Much of that snow melted the last part of January and into February, which did create some ice on the greens, but that only lasted about a month or less.

Before we got this inch of snow on the 17th, I did check many of the greens to see how the bentgrass and Poa did over the winter. The bentgrass looks great. In some cases the Poa does look like it will return. Although, on some greens where it was under ice a little bit longer, it looks like we will be slit seeding bentgrass into those areas as well as removing dead Poa and laying sod from our bentgrass nursery.

Shop season:

We were very busy in the shop and clubhouse during our short winter. We spent a lot of time going through every single piece of equipment that we own. We changed oil, greased parts, replaced old bearings and broken parts, and put a sharp edge on all of our cutting units. Some pieces of equipment spent more time in the shop than others. We have some very old equipment that required more replacement parts and some newer equipment that just needed an oil change, tune up and blade sharpening. Hopefully as a club, we can continue to replace some of those older pieces of equipment that continually require replacement parts as the equipment has seen many thousands of hours of wear and tear on the golf course each season.

This is the Constant Velocity Joint on our 4WD Workman, which drives the wheels and accommodates for the up and down motion of the suspension.  Our Workman is vital to our fleet as we use it to top dress greens and it is the only piece of equipment we have that we can use to pull our heavy top dresser. We took apart the front axle housing and CV joints on the Workman to replace boots, bearings and greased everything up.  
This was the axle housing holding the CV joint/axle together on our 4WD Workman. As you can see, the bearing melting to the axle housing and warped the outer piece of the axle housing. This part needed to be replaced to make sure the axle and wheel stay on the Workman and provides a safe drive throughout the season.

Beyond fine tuning the equipment for the 2016 season, Justin and I spent a few weeks in the clubhouse with Doug renovating a section of the kitchen and painting the downstairs. Both of these projects turned out great and will make a huge impact on the appearance and operation of our dated clubhouse.

Coming up:

The forecast does show some cooler weather for the next 7-14 days, but we hope to get the course open for play as soon as possible. As soon as the fairways and rough dry up enough to drive and play on with out damaging turf, we will allow golfers to come out and enjoy an early season.

We do have a few minor course projects planned beyond normal course maintenance this upcoming spring. I hope to have a few staff members help with finishing up some bunker drainage and possibly a new landscape around the club entrance sign. Also, as soon as our bentgrass nursery is ready to cut, we will begin the annual collar sodding projects around greens. This is necessary to remove as much Poa annua from the collars and greens as possible. We are going to lay some of our bentgrass sod into some of our struggling greens areas as well, such as the left side of #6 green. This is extremely necessary as some areas on the left side of that green have been unputtable the last few seasons.

I look forward to the 2016 golf season and to continue to keep the Grand Forks Country Club golf course in the absolute best condition.

We aren't too far away from this!